On 2/9/2016 1, the vessel HARVEST RISING (Official Number 3926) was involved in a total failure of any machinery or technical system in First Narrows Bridge, Vancouver, BC, BRITISH COLUMBIA (BC).
The vessel, with 0 persons on board, experienced the incident while engaged in regular operations.
No injuries or fatalities were reported, and there was none pollution.
On 09 February 2016, the bulk carrier "HARVEST RISING", under the conduct of a pilot, reported a machinery failure in English Bay, Vancouver, BC. The vessel drifted for 30 minutes while the crew effected repairs.. Damage to the vessel was indicated as UNKNOWN
Weather at the time was reported as unknown. This incident was officially recorded by Transport Canada on 2/9/2016 1.